Appropriation of procured funds(As of March 31, 2022)
Item | Amount | |
---|---|---|
Procurement amount (amount received) | 9.9 billion yen | |
Appropriated amounts | 9.9 billion yen | |
(breakdown) | Kurokawadaira Hydro Power (Nagano Pref.) | 0.1 billion yen |
Ichishiro Hydro Power (Shizuoka Pref.) | 0.1 billion yen | |
Seinaiji Hydro Power (Nagano Pref.) | 1.9 billion yen | |
Abekawa Hydro Power (Shizuoka Pref.) | 2 billion yen | |
Yokkaichi Biomass (Mie Pref.) | 5.4 billion yen | |
Atsumi Onshore Wind Power (Aichi Pref.) | 0.1 billion yen | |
Unappropriated balance |
*1 Figures less than the expressed unit are rounded down.
*2 Of the amount procured, 5.9 billion yen was allocated to the refinancing of the construction funds for the Yokkaichi Biomass Power Plant and the Seinaiji Hydroelectric Power Plant.
Environmental improvement effect(April 2021-March 2022)
Project | Installed capacity |
Amount of CO2 emission reductions |
---|---|---|
Kurokawadaira Hydro Power (Nagano Pref.) | 0.2 MW | 141,572(t-CO2/y) |
Yokkaichi Biomass (Mie Pref.) | 49.0 MW |
*1 Annual CO2 emission reduction calculation method: FY2021 annual power generation volume (MWh) x CO2 emission coefficient (t-CO2/MWh)
*2 As of March 31, 2022, the Ichishiro Hydro Power Station, Seinaiji Hydro Power Station, Abekawa Hydro Power Station, and Atsumi Onshore Wind Power Station listed in the allocation of procured funds are currently under construction. The environmental improvement effects will be reported after the start of operations.