Chubu Electric Power Group Report 2021(Integrated Report)
47/96

Maximize the Value of Management Resources We own 191 hydroelectric power plants (excluding pumping water) in the Chubu region (As of March 31, 2021). We strives to increase power generation capacity by reviewing the opti-mum power generating facilities in accordance with river ow conditions at the time of facility renovation, reducing the time period for suspending power generation during inspection and construction work, and raising the operating water level of the dam.Seinaiji hydro power (current status)Yonago biomass (current status)Renewable Energy CompanyPower source development to reach 2,000 MW • With regard to renewable energy, the whole Group is work-ing together with the goal of developing 2,000 MW or more by around 2030.• At present, the output based on equity ownership*1 of the entire Group is approximately 570MW, which is about 29% progress*2 versus the target.• We will actively pursue the development and expansion of ownership of solar power in the short term, hydro power, biomass, on-land wind power in the medium term and offshore wind power and geothermal power in the long term, not only in supply areas but also throughout the whole country. In this way, we will aim to improve energy self- sufciency in Japan and achieve a carbon-free society.*1 Includes projects for which a decision on development has already been made but operations have not started.*2 Progress from the end of FY 2017 to June 30, 2021Main InitiativesMain recent development sitesExamples of main initiativesFacility capacityDevelopment of 2,000 MW or more to approximately double the facility capacity3,130 MW*32,560 MW*3Solar power 520Wind power 190Biomass 260Hydro power 2,160(excluding pumped storage)End of FY2020Around 2030End of FY2017*3 Facility capacity including group companiesMiyako Kuzakai Solar Park 18,000 kW, operation started in May 2019Akita Port / Noshiro Port offshore wind powerApprox. 139,000 kW, expected to start operation in 2022Kamisu biomass50,000 kW, expected to start operation in 2023Tsuruga Green Power37,000kW, Chubu Electric Power acquired stake in Feb.2021Yonago biomass54,500 kW, expected to start operation in 2021Yatsushiro biomass75,000kW, expected to start operation in 2024Godo biomass7,500 kW, expected to start operation in 2022Uchigatani hydro power720 kW, expected to start operation in 2025Kurokawadaira hydro power170kW, operation started in July 2021Ichishiro hydro power160kW, expected to start operation in 2021Abekawa hydro power7,500kW, expected to start operation in 2024Omaezaki Port biomass74,950 kW, expected to start operation in 2023Yokkaichi biomass49,000 kW, operation started in May 2020Gamagoori biomass50,000 kW, expected to start operation in 2023Atsumi on-land wind power7,400 kW, expected to start operation in 2022Seinaiji hydro power5,600 kW, expected to start operation in 2022Minokamo biomass7,100kW, expected to start operation in 2023Commence operationCommence operationUnder constructionDevelopment decided(As of August 31, 2021)46Chubu Electric Power Group Report 2021Top CommitmentValue CreationClimate ChangeStrategyBusiness ActivitiesGovernanceHuman ResourcesFinancial / Corporate Data

元のページ  ../index.html#47

このブックを見る