Press Release
September 2015 and FY2015 1st Half Power Generated and Purchased (Preliminary Report)
October 08, 2015
Chubu Electric Power Co.,Inc.
Overview of September 2015
- The volume of power generated and purchased declined YOY, ending at 99.3% of the volume of the same period one year ago.
Overview of FY2015 1st half
- The volume of power generated and purchased declined YOY, ending at 99.3% of the volume of the same period one year ago.
1. Volume of power generated and purchased
September |
FY2015 1st half total |
|
---|---|---|
Power generated and purchased |
10,683 |
65,460 |
Internally generated power Breakdown :Hydro Power |
1,051 |
5,743 |
Internally generated power Breakdown :Thermal Power |
8,278 |
53,643 |
Internally generated power Breakdown :Nuclear power |
0 |
0 |
Internally generated power Breakdown :Wind power,solar power |
4 |
27 |
Received from other sources |
1,350 |
6,047 |
2. Maximum power monthly three-day average
September |
1st half |
|
---|---|---|
Maximum power three-day average(% of previous year) |
20,490 |
24,780 |
*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
3. Flow rate
September |
1st half |
|
---|---|---|
Flow rate |
139.4 |
114.0 |
*Water supply rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.
4. Rate of use of nuclear facilities
September |
1st half |
|
---|---|---|
Rate of use of nuclear facilities |
0.0 |
0.0 |
*Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011(periodic inspections from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011(periodic inspections from March 22, 2012)