Press Release

Press Release

September 2015 and FY2015 1st Half Power Generated and Purchased (Preliminary Report)

October 08, 2015
Chubu Electric Power Co.,Inc.

Overview of September 2015

  • The volume of power generated and purchased declined YOY, ending at 99.3% of the volume of the same period one year ago.

Overview of FY2015 1st half

  • The volume of power generated and purchased declined YOY, ending at 99.3% of the volume of the same period one year ago.

1. Volume of power generated and purchased

(Unit: GWh)

September

FY2015 1st half total

Power generated and purchased
(% of previous year)

10,683
(95.3)

65,460
(97.0)

Internally generated power Breakdown :Hydro Power
(% of previous year)

1,051
(86.8)

5,743
(104.8)

Internally generated power Breakdown :Thermal Power
(% of previous year)

8,278
(97.3)

53,643
(98.3)

Internally generated power Breakdown :Nuclear power
(% of previous year)

0
(Does not apply)

0
(0.0)

Internally generated power Breakdown :Wind power,solar power
(% of previous year)

4
(37.0)

27
(69.9)

Received from other sources
(% of previous year)

1,350
(85.4)

6,047
(75.9)

2. Maximum power monthly three-day average

(Unit: MW)

September

1st half

Maximum power three-day average(% of previous year)

20,490
(90.1)

24,780
(93.0)

*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.

3. Flow rate

(Unit: %)

September

1st half

Flow rate

139.4

114.0

*Water supply rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.

4. Rate of use of nuclear facilities

(Unit: %)

September

1st half

 Rate of use of nuclear facilities

0.0

0.0

*Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011(periodic inspections from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011(periodic inspections from March 22, 2012)

The chart of Air temperature in Nagoya (September), Volume of power generated and purchased vs. previous year

Go to the Top of the Page