Press Release
March 2010, FY2009 (2nd half) and FY2009 (Entire) Power Generated and Purchased (Preliminary Report)
April 08, 2010
Chubu Electric Power Co.,Inc.
Overview of March 2010
- The volume of power generated and purchased came to 109.7% the volume of the same period a year ago to show a year-on-year increase.
FY2009 (2nd half and Entire)
- The volume of power generated and purchased in the 2nd half of FY2009 was 102.0% the volume of the same period a year ago, showing a year-on-year increase.
- The volume of power generated and purchased in FY2009 was 94.7% the volume of the same period a year ago, showing a year-on-year decrease.
1. Volume of power generated and purchased
|
March 2010 |
FY2009 2nd Half |
FY2009 |
---|---|---|---|
Power generated and purchased |
11,898 |
68,746 |
133,745 |
Internally-generated power (% of previous year) |
973 |
3,432 |
8,594 |
Internally-generated power (% of previous year) |
7,528 |
46,109 |
92,236 |
Internally-generated power (% of previous year) |
1,678 |
9,749 |
14,130 |
Internally-generated power (% of previous year) |
1 |
2 |
2 |
Received from other sources (% of previous year) |
1,718 |
9,454 |
18,783 |
2. Maximum power monthly three-day average
|
March 2010 |
FY2009 2nd Half |
FY2009 |
---|---|---|---|
Maximum power three-day average |
21,250 |
23,020 |
23,880 |
*Calculated by taking the average from the three days within the pertinent month on which the highest volume of electricity is recorded.
*The maximum power three-day average for the 2nd half occurred in January, and that for the fiscal year occurred in July.
3. Flow rate
March 2010 |
FY2009 2nd Half |
FY2009 |
|
---|---|---|---|
Flow rate |
164.1 |
111.5 |
102.4 |
*Flow rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.
4. Rate of use of nuclear facilities
|
March 2010 |
FY2009 2nd Half |
FY2009 |
---|---|---|---|
Rate of use of nuclear facilities |
64.4 |
63.7 |
46.0 |
*Hamaoka Nuclear Power Station Reactor No. 5 operations suspended from August 11, 2009 (periodic inspections from March 15,2010)