Press Release

Press Release

September 2011 and FY2011 1st Half Power Generated and Purchased (Preliminary Report)

October 11, 2011
Chubu Electric Power Co.,Inc.

Overview of September 2011

  • The volume of power generated and purchased declined YOY, ending at 93.5% of the volume of the same period one year ago.

Overview of FY2011 1st half

  • The volume of power generated and purchased declined YOY, ending at 95.1% of the volume of the same period one year ago.

1.Volume of power generated and purchased

(Unit: GWh)

September 2011

FY2011 1st-half total

Power generated and purchased
(% of previous year)

11,652
(93.5)

67,998
(95.1)

Internally generated power Breakdown :Hydro Power
(% of previous year)

1,034
(160.8)

5,774
(104.1)

Internally generated power Breakdown :Thermal Power
(% of previous year)

9,316
(108.7)

52,888
(111.9)

Internally generated power Breakdown :Nuclear power
(% of previous year)

0
(0.0)

2,616
(26.6)

Internally generated power Breakdown :Wind/Solar power
(% of previous year)

3
(285.4)

21
(341.8)

Received from other sources
(% of previous year)

1,299
(79.1)

6,699
(76.1)

2.Maximum power monthly three-day average

(Unit: MW)

September 2011

FY 2011 1st-half total

Maximum power three-day average(% of previous year)

23,390
(88.1)

25,020
(92.7)

*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
The days used to calculate the maximum power three-day average for the 1st half occurred in August.

3.Flow rate

(Unit: %)

September 2011

FY 2011 1st-half total

Flow rate

143.4

113.8

*Flow rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.

4.Rate of use of nuclear facilities

(Unit: %)

September 2011

FY 2011 1st-half total

 Rate of use of nuclear facilities

0.0

16.5

*Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations have been suspended since May 13,2011
Reactor No. 5 operations have been suspended since May 14,2011

Go to the Top of the Page