September 2012 and FY2012 1st Half Power Generated and Purchased (Preliminary Report)

October 10, 2012
Chubu Electric Power Co.,Inc.

Overview of September 2012

  • The volume of power generated and purchased declined YOY, ending at 98.6% of the volume of the same period one year ago.

Overview of FY2012 1st half

  • The volume of power generated and purchased increased YOY, ending at 100.4% of the volume of the same period one year ago.

1.Volume of power generated and purchased

(Unit: GWh)

September

FY2012 1st half total

Power generated and purchased
(% of previous year)

11,526
(98.6)

68,290
(100.4)

Internally generated power Breakdown :Hydro Power
(% of previous year)

545
(52.1)

4,745
(82.0)

Internally generated power Breakdown :Thermal Power
(% of previous year)

10,449
(112.2)

61,879
(117.0)

Internally generated power Breakdown :Nuclear power
(% of previous year)

0
(-)

0
(0.0)

Internally generated power Breakdown :Wind power,solar power
(% of previous year)

3
(80.6)

23
(110.7)

Received from other sources
(% of previous year)

529
(39.9)

1,643
(24.4)

2.Maximum power monthly three-day average

(Unit: MW)

September

1st half

Maximum power three-day average(% of previous year)

23,380
(100.0)

24,570
(98.2)

*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
The maximum power three-day average for FY2012 1st half occurred in July.

3.Flow rate

(Unit: %)

September

1st half

Flow rate

64.2

93.3

*Water supply rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.

4.Rate of use of nuclear facilities

(Unit: %)

September

1st half

 Rate of use of nuclear facilities

0.0

0.0

*Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011(periodic inspections from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011(periodic inspections from March 22, 2012)

 