Press Release
March 2014, FY2013 (2nd half) and FY2013 (Entire) Power Generated and Purchased (Preliminary Report)
April 08, 2014
Chubu Electric Power Co.,Inc.
Overview of March 2014
- The volume of power generated and purchased came to 105.0% the volume of the same period a year ago, showing a year-on-year increase.
FY2013 (2nd Half and Entire)
- The volume of power generated and purchased in the 2nd half of FY2013 was 101.9% the volume of the same period a year ago, showing a year-on-year increase.
- The volume of power generated and purchased in FY2013 was 100.7% the volume of the same period a year ago, showing a year-on-year increase.
1. The volume of power generated and purchased
March 2014 |
FY2013 2nd Half |
FY2013 |
|
---|---|---|---|
Power generated and purchased |
11,854 |
70,084 |
138,067 |
Internally generated power Breakdown :Hydro Power |
695 |
3,245 |
7,820 |
Internally generated power :Thermal Power |
10,228 |
62,584 |
120,763 |
Internally generated power :Nuclear power |
0 |
0 |
0 |
Internally generated power :Wind power, solar power |
6 |
29 (88.9) |
53 |
Received from other sources |
925 |
4,226 |
9,431 |
2. Maximum power monthly three-day average
March 2014 |
FY2013 2nd Half |
FY2013 |
|
---|---|---|---|
Maximum power three-day average(% of previous year) |
21,730 |
23,090 |
25,640 |
*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
The maximum power three-day average for FY2013 2nd half occurred in February.
The maximum power three-day average for FY2013 occurred in August.
3. Flow rate
March 2014 |
FY2013 2nd Half |
FY2013 |
|
---|---|---|---|
Flow rate |
116.0 |
106.1 |
95.6 |
*Flow rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) × 100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.
4. Rate of use of nuclear facilities
March 2014 |
FY2013 2nd Half |
FY2013 |
|
---|---|---|---|
Rate of use of nuclear facilities |
0.0 |
0.0 |
0.0 |
*Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended from Nov. 29, 2010 (Undergoing regular facility inspection)
Reactor No. 4 operations suspended from May 13, 2011 (Undergoing regular facility inspection from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011 (Undergoing regular facility inspectionfrom March 22, 2012)