Press Release
March 2015, FY2014 (2nd half) and FY2014 (Entire) Power Generated and Purchased (Preliminary Report)
April 10, 2015
Chubu Electric Power Co.,Inc.
Overview of March 2015
- The volume of power generated and purchased came to 98.2% the volume of the same period a year ago, showing a year-on-year decrease.
FY2014 (2nd Half and Entire)
- The volume of power generated and purchased in the 2nd half of FY2014 was 98.1% the volume of the same period a year ago, showing a year-on-year decrease.
- The volume of power generated and purchased in FY2014 was 97.5% the volume of the same period a year ago, showing a year-on-year decrease.
1. The volume of power generated and purchased
March 2015 |
FY2014 2nd Half |
FY2014 |
|
---|---|---|---|
Power generated and purchased |
11,601 |
68,706 |
134,635 |
Internally generated power Breakdown :Hydro Power |
775 |
3,889 |
8,704 |
Internally generated power Breakdown :Thermal Power |
9,922 |
60,224 |
117,415 |
Internally generated power Breakdown :Nuclear power |
0 |
0 |
0 |
Internally generated power Breakdown :Wind power, solar power |
7 |
28 |
45 |
Received from other sources |
897 |
4,564 |
8,471 |
2. Maximum power monthly three-day average
March 2015 |
FY2014 2nd Half |
FY2014 |
|
---|---|---|---|
Maximum power three-day average(% of previous year) |
21,270 |
23,040 |
23,840 |
* Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
The maximum power three-day average for FY2014 2nd half occurred in December.
The maximum power three-day average for FY2014 occurred in August.
3. Flow rate
March 2015 |
FY2014 2nd Half |
FY2014 |
|
---|---|---|---|
Flow rate |
115.3 |
120.8 |
104.4 |
* Flow rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) × 100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.
4. Rate of use of nuclear facilities
March 2015 |
FY2014 2nd Half |
FY2014 |
|
---|---|---|---|
Rate of use of nuclear facilities |
0.0 |
0.0 |
0.0 |
* Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended from Nov. 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011 (periodic inspections from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011 (periodic inspections from March 22, 2012)