Press Release
September 2013 and FY2013 1st Half Power Generated and Purchased (Preliminary Report)
October 10, 2013
Chubu Electric Power Co.,Inc.
Overview of September 2013
- The volume of power generated and purchased declined YOY, ending at 97.6% of the volume of the same period one year ago.
Overview of FY2013 1st half
- The volume of power generated and purchased declined YOY, ending at 99.5% of the volume of the same period one year ago.
1.Volume of power generated and purchased
September |
FY2013 1st half total |
|
---|---|---|
Power generated and purchased |
11,310 |
67,981 |
Internally generated power Breakdown :Hydro Power |
853 |
4,571 |
Internally generated power Breakdown :Thermal Power |
9,328 |
58,181 |
Internally generated power Breakdown :Nuclear power |
0 |
0 |
Internally generated power Breakdown :Wind power,solar power |
3 |
24 |
Received from other sources |
1,126 |
5,205 |
2.Maximum power monthly three-day average
September |
1st half |
|
---|---|---|
Maximum power three-day average(% of previous year) |
22,920 |
25,640 |
*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
The maximum power three-day average for FY2013 1st half occurred in August.
3.Flow rate
September |
1st half |
|
---|---|---|
Flow rate |
112.9 |
88.5 |
*Water supply rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.
4.Rate of use of nuclear facilities
September |
1st half |
|
---|---|---|
Rate of use of nuclear facilities |
0.0 |
0.0 |
*Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011(periodic inspections from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011(periodic inspections from March 22, 2012)