September 2013 and FY2013 1st Half Power Generated and Purchased (Preliminary Report)

October 10, 2013
Chubu Electric Power Co.,Inc.

Overview of September 2013

  • The volume of power generated and purchased declined YOY, ending at 97.6% of the volume of the same period one year ago.

Overview of FY2013 1st half

  • The volume of power generated and purchased declined YOY, ending at 99.5% of the volume of the same period one year ago.

1.Volume of power generated and purchased

(Unit: GWh)

September

FY2013 1st half total

Power generated and purchased
(% of previous year)

11,310
(97.6)

67,981
(99.5)

Internally generated power Breakdown :Hydro Power
(% of previous year)

853
(151.8)

4,571
(96.0)

Internally generated power Breakdown :Thermal Power
(% of previous year)

9,328
(89.3)

58,181
(94.0)

Internally generated power Breakdown :Nuclear power
(% of previous year)

0
(-)

0
(0.0)

Internally generated power Breakdown :Wind power,solar power
(% of previous year)

3
(105.8)

24
(102.1)

Received from other sources
(% of previous year)

1,126
(196.1)

5,205
(308.3)

2.Maximum power monthly three-day average

(Unit: MW)

September

1st half

Maximum power three-day average(% of previous year)

22,920
(98.0)

25,640
(104.3)

*Calculated by taking the average from the three days within the applicable month on which the highest volume of electricity is recorded.
The maximum power three-day average for FY2013 1st half occurred in August.

3.Flow rate

(Unit: %)

September

1st half

Flow rate

112.9

88.5

*Water supply rate = (Volume of hydro-generated electricity/Average hydro-generated electricity for past 30 years) ×100
Results greater than 100% denote high water flows; results less than 100% denote low water flows.

4.Rate of use of nuclear facilities

(Unit: %)

September

1st half

Rate of use of nuclear facilities

0.0

0.0

*Hamaoka Nuclear Power Station
Reactor No. 3 operations have been suspended since November 29, 2010 (periodic inspection)
Reactor No. 4 operations suspended from May 13, 2011(periodic inspections from January 25, 2012)
Reactor No. 5 operations suspended from May 14, 2011(periodic inspections from March 22, 2012)